Troubleshooting Mitsubishi A800 Drive Communication Issue with CompactLogix PLC

Question:

I successfully linked and configured my Mitsubishi A800 drive to a CompactLogix PLC using the A8NEIP 2P module. However, when I give the start command, the drive's start button starts flashing. The manual indicates that this is due to the frequency command not being given or being lower than the starting frequency. Do I need to adjust the parameter settings in the drive to receive the frequency command properly? How can I resolve this issue efficiently?

Top Replies

When controlling a drive through the network using an option card, it is essential to properly configure various parameters. Parameters such as Pr. 340 and Pr. 79 determine the Operation Mode of the drive, which should be set to NET operation mode for optimal performance. Additionally, Pr. 338 controls the Communication operation command source, while Pr. 339 manages the Communication speed command source. To select the NET mode operation command source, you will need to adjust parameter Pr. 550. For detailed information on these configurations, refer to the drive's Instruction Manual (Detailed) starting on page 404: https://www.mitsubishielectric.com/dl/fa/document/manual/inv/ib0600503eng/ib0600503engn.pdf.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Why does the start button on my Mitsubishi A800 drive flash when I give the start command from the CompactLogix PLC?

Answer: The flashing start button indicates that the frequency command is either not being received or is lower than the starting frequency. This issue can be resolved by adjusting the parameter settings in the drive to receive the frequency command properly.

FAQ: 2. How can I efficiently resolve the communication issue between my Mitsubishi A800 drive and CompactLogix PLC?

Answer: To efficiently resolve the communication issue, you may need to adjust the parameter settings in the drive to ensure it receives the frequency command correctly. Additionally, check the connection setup and configuration between the A800 drive and the CompactLogix PLC.

FAQ: 3. Which module is recommended for linking and configuring a Mitsubishi A800 drive with a CompactLogix PLC?

Answer: The A8NEIP 2P module is recommended for linking and configuring a Mitsubishi A800 drive with a CompactLogix PLC. Ensure that the module is properly connected and configured for communication between the devices.

FAQ: 4. What can be done if the frequency command is not being received properly by the Mitsubishi A800 drive?

Answer: If the frequency command is not being received properly, you may need to adjust the parameter settings in the drive to ensure it accepts and responds to the frequency commands from the CompactLogix PLC

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →