Troubleshooting No module named pylogix error with Pylogix and 5380 CompactGuard Logix plugins

Question:

Hey there! I installed Pylogix (via pip install pylogix) to communicate with the 5380 CompactGuard Logix. I use Visual Studio 2022 for my projects. Despite downloading examples from GitHub, I keep encountering an error message that says "No module named 'pylogix'" whenever I try running the scripts. The files are definitely saved on my C drive, so I'm sure they're downloaded. Any tips or recommendations?

Top Replies

Looking for the installation location of a Python module using the pip command? Make sure to have the path available in your Python (VS 2022?) environment settings. Give it a try now!

Navigate to the 'Users' folder on your computer, then locate the 'randerson' subfolder. From there, access the 'appdata' folder followed by the 'local' folder. Inside the 'local' folder, you will find the 'python' directory, which contains the 'site-packages' folder. Finally, locate the 'pylogix' module within the 'site-packages' folder.

Are you utilizing virtual environments for optimal performance and efficiency? Explore the benefits of leveraging virtual environments for your operations.

Negative, not at all.

If you are using Windows, it is advisable to verify in the command prompt whether pip can recognize the package. To view all available packages, run the following command. Make sure "pylogix" is included in the list, indicating successful installation: Code: py -m pip list

Hey there! It seems like your Python environment might not be recognizing the installed Pylogix package. When your Python script runs, it looks for modules in the directories listed in sys.path. You could make sure that the installed packages are in these directories. As another try, you could uninstall and reinstall Pylogix--sometimes pip installs can go wrong. Also, ensure that you're using a Python interpreter that matches the one you used to install Pylogix, as using different ones could create some confusion. Finally, to ensure the module installs correctly, try using "pip install pylogix --upgrade".

Hey! It sounds like you might be dealing with an environment issue. Pylogix might have been installed in a different Python environment other than the one Visual Studio 2022 is using. I'd recommend checking your Python interpreter in Visual Studio and make sure it matches with the one you used to install Pylogix. If it doesn't match, you may need to either change the Python interpreter in Visual Studio to match the one Pylogix is installed in or reinstall Pylogix in the Python environment Visual Studio is using. Good luck!

It sounds like you're having a classic case of Python environment issues! Make sure that you're running your script in the same Python environment where you installed Pylogix. You can check this by running `pip show pylogix` in your terminal to confirm the installation path. If you have multiple versions of Python installed, you might be accidentally using a different one in Visual Studio. Another thing to try is restarting your IDE or your computer after the installation, as that can sometimes help it recognize newly installed packages. Let me know how it goes!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Why am I getting the "No module named 'pylogix'" error when running scripts with Pylogix and 5380 CompactGuard Logix plugins?

Answer: - This error typically occurs when Python cannot find the installed Pylogix module. Double-check your installation to ensure that Pylogix is properly installed and accessible to your Python environment.

FAQ: 2. How can I troubleshoot the "No module named 'pylogix'" error with Pylogix and 5380 CompactGuard Logix plugins?

Answer: - First, verify that Pylogix is installed correctly by checking your Python environment. You may need to reinstall Pylogix using pip or ensure that the module is added to your Python path.

FAQ: 3. I have downloaded examples from GitHub, but still encounter the 'No module named 'pylogix'' error. What should I do?

Answer: - If you have downloaded examples from GitHub and are still facing this issue, make sure that the examples are referencing the correct path to the Pylogix module. Adjust the import statements in the scripts to match the location of your Pylogix installation.

FAQ: 4. I use Visual Studio 2022 for my projects. Could this be causing the 'No module named 'pylogix'' error?

Answer: - Visual Studio 2022 should not directly cause the "No module named 'pylogix'" error. Ensure that your Python environment within Visual Studio is configured to recognize the Py

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →