Troubleshooting Overlapping Toolbars in Logix Designer

Question:

I am learning how to arrange the template for my controls in Logix Designer, as I have experience with RS500 and RS5000. However, I am encountering issues with overlapped Toolbars in Logix Designer that I cannot seem to fix or resize. For example, when I select a (bit), all the symbols are hidden behind the tab. I can only see them if I hover next to the line, but it is not displaying correctly. Thank you for any help or suggestions.

Top Replies

Encountering display issues on high-resolution devices? Follow these steps to resolve the problem: Find the folder containing the LogixDesigner.exe file, typically located at C:\Program Files (x86)\Rockwell Software\Studio 5000\Logix Designer\ENU\v33\Bin. Make sure to select the LogixDesigner.exe file specifically, ignoring other files like "LogixDesigner.exe.config" and "LogixDesigner.exe.Local." Right-click on LogixDesigner.exe, go to Properties, navigate to the Compatibility tab, and click on the Change high DPI settings button. Check the box for Override high DPI scaling behavior and choose System (Enhanced). Click OK to confirm and close all windows. Finally, launch Logix Designer to see if the icons display correctly. Don't let high-resolution woes slow you down - follow these steps for a smooth experience.

When attempting to access Logic Designer .Exe, I found that the compatibility tab was missing when I right-clicked for properties.

The file you found is an XML file, which is not the correct one to use. It was one of the files I mentioned to disregard. Please search for the proper application as shown in my initial screenshot. OG

I finally found the properties I needed for the "Logic Designer" application, not the "Logic Designer .exe" file. It took some trial and error with different versions, but I'm happy with the outcome. This discovery would have been impossible without your help. Thank you!

By default, your computer's Windows operating system hides known file extensions. This means that file names like "LogixDesigner.exe" may appear as just "LogixDesigner" in your file explorer. Similarly, XML files may not display their ".xml" extension, resulting in filenames like "LogixDesigner.exe.config" being shown as "LogixDesigner.exe". To ensure clarity and avoid confusion, one of the initial steps I take on any Windows device is to adjust the settings to display file extensions. This simple adjustment can prevent misunderstandings and make file management more efficient.

It sounds like you're dealing with a pretty common issue in Logix Designer. Sometimes, there can be display issues caused by the screen resolution setting. Try adjusting your computer's screen resolution. If that doesn't work, reset your Logix Designer workspace. You can do this by going to 'Window' -> 'Reset Perspective'. This will bring all the toolbars/windows back to their default positions. If none of these suggestions help, it might be a software glitch, and you might need to reinstall Logix Designer.

It sounds like you're having a bit of a GUI issue with Logix Designer, which can be frustrating. When you encounter overlapping toolbars, it could be an issue of screen resolution or scaling settings on your PC. To troubleshoot, ensure your system's display settings match the recommended settings for the software. If this doesn't work, you can try resetting the toolbars to their default setting under "View" > "Customize" > "Toolbars" > "Reset All", then close and re-open the Logix Designer. If all else fails, a reinstall of the application could be the last resort - it's drastic but often solves many unexplained issues.

It sounds frustrating to deal with overlapping toolbars in Logix Designer! Have you tried resetting the workspace or adjusting the layout settings? Sometimes maximizing the window or switching between different views can also help clear up display issues. If all else fails, checking if there are any updates available for Logix Designer could help, as that might fix bugs related to GUI problems. Hope you get it sorted soon!

It sounds like you're running into a frustrating issue with the UI in Logix Designer! Have you tried adjusting the layout settings or looking for any options under the "View" menu to restore the default layout? Sometimes, simply resetting the workspace can help with overlapping toolbars. If that doesn’t work, you might consider checking for any available updates for Logix Designer, as these often resolve bugs related to interface issues. Good luck, and I hope you get it sorted out soon!

It sounds like you’re having a frustrating time with the toolbar layout in Logix Designer! One thing you might try is resetting the workspace layout to see if that resolves the overlapping issue. You can usually find the option under the ‘View’ menu. Additionally, make sure your display settings are set to a recommended resolution, as that can sometimes impact how things are rendered. If that doesn’t work, consider uninstalling and reinstalling the software; it might just clear up any weird glitches. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Question: How can I fix overlapping Toolbars in Logix Designer? Answer: To resolve overlapping Toolbars in Logix Designer, try adjusting the display settings or resizing the windows to ensure all controls are visible without being obstructed.

FAQ: 2. Question: Why are my symbols hidden behind the tab when selecting a (bit) in Logix Designer?

Answer: Answer: The issue of symbols being hidden behind the tab when selecting a (bit) in Logix Designer may be due to the layout or display settings. Try resizing windows or adjusting the view to ensure proper visibility.

FAQ: 3. Question: How do I ensure correct display of controls in Logix Designer when experiencing visibility issues?

Answer: Answer: When facing visibility issues like controls being hidden in Logix Designer, consider adjusting the layout, resizing windows, or modifying display settings to ensure all elements are properly displayed and accessible.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →