Troubleshooting PLC Device Change in TIA v14: Need Help with Siemens Software

Question:

A few years ago, I completed a project using v14 of TIA for a specific company. Now, a similar project has arisen for the same company, but with different PLC and HMI hardware. I have included some screenshots to provide more clarity on the issue at hand. Firstly, the Cut sheet indicates that I can potentially use a different model number in older versions of TIA for the PLC type, which seems unusual. Secondly, when attempting to change the device in the PLC, I am unable to select the necessary option from the device library (highlighted on the right). My experience lies mainly in working with AB and Mitsubishi, so I am reaching out for assistance with navigating Siemens software. Any guidance or advice on this matter would be immensely valuable.

Top Replies

The image PLCchangedevice.png reveals that your current CPU belongs to the ET200SP series, while the desired one is part of the S7-1500, also known as the ET200MP family. It is not unexpected that you are unable to 'change device' as they are from separate product families. You may need to manually jot down all CPU parameters and remove the old one before inserting the new one.

It seems like you're dealing with a typical 'hardware-software mismatch' issue here. Siemens TIA Portal indeed has a quirk where certain hardware versions only work with certain software versions. This often poses a problem when working on legacy projects. Firstly, referring to the cut sheet, older versions of TIA can indeed handle different models of PLCs – bear in mind though, that some features may not be supported. Secondly, with regards to the device library issue, do ensure you have downloaded and installed the latest Siemens hardware catalog for TIA Portal. It normally updates the device library with all the recent hardware additions. However, if you already tried that and the required device is still MIA, try establishing a connection with the target PLC and doing an upload. This should automatically add the correct PLC type to your project. If all else fails, contacting Siemens tech support might be the way to go. Good luck!

It sounds like you're navigating some common challenges with TIA Portal! Since you’re moving to a different PLC and HMI, it’s crucial to ensure that the project settings are compatible with the new hardware. You might want to check for any updates or hotfixes for the TIA version you're using, as hardware compatibility can sometimes be limited in older versions. Additionally, consider looking up the specific model in Siemens' product documentation or forums, as others may have faced similar issues. If you still can't select the device from the library, you might need to import the device configuration or make sure that the necessary libraries are included in your project. Good luck with your project!

It sounds like you've hit a bit of a snag with the TIA Portal! When working with different hardware, especially if there's a mismatch in versions, it can definitely be tricky. Have you checked if the specific model you're trying to switch to is supported in the older version you're using? Sometimes, even though it seems like you'd be able to make that change, certain device capabilities might not be fully compatible across versions. It could also be worth looking at the online Siemens knowledge base or user forums; there are often others who have faced similar issues and might share insights or workarounds! Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Can I use a different model number of PLC in older versions of TIA software?

Answer: - Yes, it is possible to potentially use a different model number of PLC in older versions of TIA software. However, compatibility and functionality may vary, so it is recommended to refer to the software documentation or contact Siemens support for detailed information.

FAQ: 2. Why am I unable to select the necessary device option from the library when changing the device in the PLC in TIA v14?

Answer: - If you are facing difficulties selecting the necessary device option from the library in TIA v14, ensure that the device library is up-to-date and compatible with the new PLC hardware. You may also need to check for any software updates or patches that address device compatibility issues.

FAQ: 3. How can I navigate Siemens software in TIA v14 if I mainly have experience with AB and Mitsubishi devices?

Answer: - To navigate Siemens software in TIA v14 when coming from a background of working with AB and Mitsubishi devices, consider leveraging online resources such as tutorials, forums, and Siemens support documentation. Additionally, reaching out to the Siemens community or attending training sessions specific to Siemens software can help in familiarizing yourself with the platform.