Troubleshooting PowerFlex 755 Drive Setup: Minimum Speed Issue with Potentiometer Input

Question:

Hello everyone, I am currently facing an issue with my first PowerFlex 755 drive setup. When I start the drive, it runs at the minimum speed of 5Hz, even though parameter 2 indicates that the command speed reference is coming from my potentiometer. This is a new setup, and the motor spins freely. The configuration is simply Stop/Start with adjustable speed from the potentiometer. I would appreciate any assistance in identifying what I may be overlooking. I have made changes to parameters as detailed in the PDF. Thank you in advance for any help provided.

Top Replies

Determine if your vehicle is in Automatic mode by checking the HIM. It may currently be in manual mode.

Watch HIM showcase Auto.

When troubleshooting control issues, don't forget to check the safety inputs as well. If you're not using them, make sure to keep the jumper installed for the drive to function properly. This step is crucial for ensuring the safe operation of the equipment.

Is it possible to utilize analog input on the primary control board instead of the supplemental I/O module? It appears that there may be an issue with the reference signal, causing the drive to operate at the minimum set speed.

Have you verified the jumpers as outlined in Manual Publication 750-IN111B-EN-P from March 2022 on page 4?

Hey there, it sounds like you've got a tricky situation on your hands. One thing that comes to mind if your PowerFlex 755 is running at minimum speed despite settings from your potentiometer is to double-check the calibration of the potentiometer itself. Also, an overlooked A/D calibration can sometimes be the culprit as well. It might also be worth examining the frequency at which your drive input command is set, as an incorrect frequency could affect the speed. Lastly, a simple firmware update could rectify the issue. Don't forget that technical support from the manufacturer is often just a phone call away. They might also have a solution to your issue.

Sounds like a bit of a headache. It could be various things, but one thing to double-check is the continuity of the potentiometer wiring. Sometimes, a poor connection or a short can cause this sort of issue. Also, confirm if parameter 36 - Low Speed Select, is set appropriately, sometimes, this might limit the motor's speed. And finally, make sure your speed reference source, under parameter 39 Speed Reference 1 Select, is set correctly for the potentiometer. Hope you sort it out!

Hey there! It sounds like you’re off to a good start, but I’d suggest double-checking a few things. First, ensure the potentiometer is correctly wired and functioning, as a faulty connection might limit your control. Also, verify that the drive's minimum speed setting isn't hardcoded to 5Hz—sometimes those parameters can be slightly misleading. Lastly, it might be worth reviewing the control mode settings (like PRV or AMN) to make sure everything aligns with your desired setup. Good luck, and I hope you get it running smoothly soon!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Why is my PowerFlex 755 drive running at the minimum speed of 5Hz even though the potentiometer input is set as the command speed reference?

Answer: - The issue could be related to the drive configuration or parameter settings. Ensure that the potentiometer input is correctly configured and that the drive parameters are set up to accept the potentiometer signal for speed control.

FAQ: 2. What should I check if my PowerFlex 755 setup is not responding to changes from the potentiometer for speed control?

Answer: - Verify the wiring connections between the potentiometer and the drive, ensure that the potentiometer is functioning properly, and double-check the parameter settings related to analog input configuration on the PowerFlex 755 drive.

FAQ: 3. How can I troubleshoot a PowerFlex 755 drive setup where the motor spins freely at startup instead of following the potentiometer input for speed control?

Answer: - Check the wiring connections, confirm that the drive is receiving the correct signal from the potentiometer, and review the drive's parameter settings to ensure that the analog input is properly assigned for speed control.

FAQ: 4. Where can I find detailed information on configuring the PowerFlex 755 drive for potentiometer input control?

Answer: - Refer to the PDF documentation provided with the drive for specific instructions on setting up potentiometer input control. Additionally, you may consult the manufacturer's technical support or online resources for guidance on configuring the Power

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →