Troubleshooting RIO Rack 2 and IFM I/O Link Connection Issues with Stratix Switches

Question:

Hello, I encountered an issue with a RIO rack 2 and IFM I/O Link dropping connection on my network. The problem was traced back to the setup involving a Stratix 2000, Stratix 5400, and Stratix 5700 switches. The RIO 2 and I/O Link were originally connected to the Stratix 2000, which was then connected to the unconfigured Stratix 5400, and finally to the configured Stratix 5700. To resolve the dropping connection problem, I bypassed the Stratix 2000 and directly connected the RIO and I/O Link to the Stratix 5400. I then configured the Stratix 5400 by setting all smartport settings to automation device, except for the port connected to the Stratix 5700 which was set as Switch for Automation. Upon checking the smartport configuration of the Stratix 5700, I noticed that everything was set to automation device except for the ports connected to the Stratix 5400 and our network switch. When I connected directly to the LAN, the connection dropout issue disappeared, but I was unable to see beyond the Stratix 5400 from my company network after the configuration changes. I suspect that the VLAN ID settings may be causing the issue as currently, both switches are set to VLAN1. As I am not an expert in networking, I am unsure about which configuration settings to adjust. I have been consulting resources but have not made much progress yet. Any assistance would be greatly appreciated.

Top Replies

If the 5400 is working correctly but you are unable to view its IP address, what exactly do you mean by that? Are you experiencing issues with pinging it or accessing its web page?

Hello harryting, Thank you for responding. I wanted to clarify that I was able to remotely access this machine through our company network before making any adjustments. However, on Friday, I encountered difficulties connecting beyond the Stratix5400 after completing the configuration. I faced the same issue this morning, but now I am able to connect successfully. The only change I made was configuring the HMI port as a PC for automation, assuming it was a Windows-based device. After switching the setting to Automation Device, I can now successfully ping all my devices on the Stratix 5400 switch. I underestimated the impact of one incorrect setting on the entire system, but it seems to have been the culprit. Everything is now working smoothly. Hopefully, it remains that way.

Thank you for the update on the thread. The reason behind its current functionality is still unclear to me. After a brief review of the manual, I believe you may have meant 'Desktop for Automation' instead. The main distinction between the two seems to be that Desktop has Portfast enabled and Device prioritizes CIP traffic QOS. By the way, many of these terms are explained in detail during CCNA study sessions, which I find beneficial in today's tech-driven world.

It sounds like you're on the right track, suspecting the VLAN configuration. Remember that even though devices are on the same VLAN, they still need to have their IP addresses set within the same subnet range to communicate. You might also have forgotten to allow VLAN 1 on the trunk link between the Stratix 5400 and 5700. Since you're already communicating between devices on VLAN 1, I'd check the allowed VLANs on that trunk and make sure VLAN 1 is allowed. Furthermore, it's not generally recommended to use VLAN 1 for your devices — it's considered best practice to leave VLAN 1 as the default for administrative purposes and use different VLANs for different devices. This could give you better network segmentation and security.

It sounds like you’ve made some solid progress in narrowing down the connection issue! Given that both switches are currently set to VLAN 1, it might indeed be worth exploring your VLAN settings further. If you have any specific VLAN configurations in your network, make sure your Stratix switches are set up to accommodate those. Also, consider checking if the ports are correctly set up for trunking if you need to allow multiple VLAN traffic across them. Sometimes, having all devices on the same VLAN can simplify things, but if they need to communicate across different VLANs, you’ll need proper routing configurations. If you’re still having trouble, reaching out to someone with more networking experience at your company could provide clarity!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: What was the initial setup that caused the dropping connection issue with the RIO Rack 2 and IFM I/O Link?

Answer: The RIO 2 and I/O Link were originally connected to the Stratix 2000, which was then connected to the unconfigured Stratix 5400, and finally to the configured Stratix 5700.

FAQ: How was the dropping connection problem resolved in the network setup involving the Stratix switches?

Answer: The issue was resolved by bypassing the Stratix 2000 and directly connecting the RIO and I/O Link to the Stratix 5400. The smartport settings on the Stratix 5400 were configured accordingly, setting all smartport settings to automation device except for the port connected to the Stratix 5700.

FAQ: What was noticed in the smartport configuration of the Stratix 5700 during troubleshooting?

Answer: In the smartport configuration of the Stratix 5700, everything was set to automation device except for the ports connected to the Stratix 5400 and the company network switch.

FAQ: What potential issue related to VLAN ID settings was suspected to be causing problems in the network setup?

Answer: The user suspected that the VLAN ID settings may be causing the issue as both switches were set to VLAN1. Adjusting VLAN configuration settings was under consideration to address the connectivity problems beyond the Stratix 5400.