Troubleshooting Siemens G120 EDS File Installation in Studio 5000

Question:

Hello everyone, Today, I encountered some difficulties while trying to install the Siemens G120 EDS files. My goal is to work with Siemens drives in Studio 5000. I am utilizing the EDS Installation Tool for this task. After selecting the EDS files from the folder and going through the installation process, it appears to be successful. However, when I attempt to add a new module in Explorer, none of the Modules are showing up in the list. I have tried adding them one by one and in bulk, as well as restarting my computer and Studio software. Interestingly, I had no issues installing a Rockwell EDS file, which promptly appeared in my module list. It's worth mentioning that I recently completed a training session on integrating these drives into Studio, where I successfully did so using a different computer. The EDS files are located in my RA folder, although this has not posed a problem for me in the past. Thank you for any assistance you can provide.

Top Replies

Discover this exemplary application from Siemens that demonstrates how to seamlessly operate a SINAMICS drive using a Logix PLC and HMI over EtherNet/IP. Learn more about this innovative solution at SIOSsupport.industry.siemens.com.

tarik1978 mentioned an application example from Siemens where a SINAMICS drive is controlled with a Logix PLC and HMI on EtherNet/IP. You can find more information on this at the Siemens Industry Support website. Thank you for sharing this valuable resource. Additionally, the ZIP file provided on the webpage contained an EDS file that resolved all issues.

Hi there, sounds like you're having a real challenge on your hands! Have you checked if you have loaded the correct EDS files for your particular Siemens model? As you know, Siemens has a wide array of drives, each of them requiring different EDS files, so slight mix-ups can happen easily. Also, check whether the EDS files are extracted properly, corrupt files might not show up in your module list. You could also try to redownload the EDS files to ensure they are not corrupted. Finally, are you running Studio 5000 as an administrator? Sometimes Windows may not allow a software to make certain changes. However, take this as a pinch of salt, I'm sharing based on my personal experiences. Maybe someone else has a more tailored solution for your issue.

Hey there, I've encountered similar issues with EDS files before. Although you've mentioned that the files are in your RA folder, you might want to double-check the exact file path of your EDS files. Sometimes, Studio 5000 can be quite specific about directories. Another suggestion would be to ensure your EDS files are of the most recent version. If not, try updating them through Siemens website. Lastly, your EDS Registration Tool may need a refresh. To do this, you'd have to go to "Tools", then "Options" within the application, and clear the EDS Registry. Restart the tool and see if the modules appear. Hope this helps!

Hey there, I totally understand your frustration. I had a similar issue before and managed to resolve it. Your EDS file might not show up if it’s incompatible with your Studio 5000 version or if it hasn't been registered correctly post-installation. My advice would be to first check the version compatibility of your EDS file and Studio 5000. If they're not compatible, you may need to get a suitable version of the EDS file or upgrade your Studio. If they are compatible, try re-registering the EDS file manually using the RSLinx software (RSWho - right click on the Ethernet driver and select "Register EDS file..."). It helped me before, and hopefully, it will solve your issue too. Good luck!

It sounds like you've done a lot of troubleshooting already! One thing to check is whether the version of the EDS files you're using is compatible with your version of Studio 5000. Sometimes, EDS files from different Siemens firmware versions can cause compatibility issues. Additionally, ensure that the EDS files are properly registered; you might want to use the EDS Hardware Installation Tool again to verify that they are installed correctly and associated with the right device class. Also, confirm that your project settings match with what the EDS files expect in terms of communication protocols. Hope this helps get your drives recognized!

Hey there! It sounds like you've done quite a bit of troubleshooting already. Have you double-checked that the EDS files are the correct version for your Studio 5000 setup? Sometimes, specific EDS files can have compatibility issues depending on the version you’re running. Also, make sure that the EDS files are properly associated with the correct hardware profile in the software. If everything looks good on that front, you might want to try reinstalling the EDS files or clearing the EDS cache as a last resort. Hope this helps!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Why are Siemens G120 EDS files not showing up in Studio 5000 after installation?

Answer: - The issue could be related to the installation process or file location. Make sure the EDS files are correctly installed using the EDS Installation Tool and located in the appropriate folder.

FAQ: 2. I successfully installed a Rockwell EDS file, but Siemens EDS files are not appearing. What could be the problem?

Answer: - The compatibility or configuration settings might be causing the Siemens EDS files not to show up. Double-check the installation steps and ensure compatibility with Studio 5000.

FAQ: 3. I have tried restarting my computer and Studio software, but the Siemens drive modules still do not show up. What else can I do?

Answer: - Check if there are any specific settings or configurations required for Siemens G120 drives in Studio 5000. You may also want to verify the EDS file integrity and compatibility with your system.

FAQ: 4. How can I troubleshoot the Siemens G120 EDS file installation issue in Studio 5000?

Answer: - You can try reinstalling the EDS files, verifying the file locations, checking for any software updates or patches, and consulting Siemens or Rockwell Automation technical support for assistance.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →