Troubleshooting Siemens S7-313 Ethernet Communication with Wonderware InTouch

Question:

Hello Siemens experts! I am currently working on establishing communication with a Siemens S7-313 PLC via Ethernet. Here is a breakdown of the project configuration: - PLC: S7-313-2D with DPCP Card 343-1EX11-0XE0 (IP: 192.168.0.2, subnet 255.255.255.0) - Server: WinXP Server 64 Bit with IP 192.168.0.98 and firewall disabled - Successfully able to ping the PLC with all packets returning under 1ms - Archestra: SMC Version DASSIDirect2 with a node named S7300 using port type "S7Cp" - Wonderware InTouch Window Maker Version 10.5 setup Do I need to configure the CP card communication in Siemens for it to work effectively? Your assistance is appreciated. Regards, Marwan

Top Replies

When setting up, focus on configuring the CP itself without the need to adjust the server. Make sure that your remote slot matches the CPU slot 2 for optimal performance.

According to RheinhardtP, it is recommended to configure the CP itself instead of the Server. Ensure that your remote slot matches the CPU slot 2. Despite configuring the CP and setting the remote connection to 2, the issue persists.

Set your Server name to "localhost" for improved performance and security.

When configuring your Wonderware server, Mr. RheinhardtP suggests setting the server name to "localhost." Simply adjust the Configuration Control Panel by specifying the IP address and subnet. Thank you for the guidance, Marwan.

When setting up your Wonderware configuration, ensure that your DA server is running on the same machine by specifying either the machine name, IP address, or localhost. However, make sure to clearly reference the node where the DAS is located. This step is crucial for seamless integration and communication within your Wonderware system.

Hi Marwan, indeed you do need to configure the CP card in your Siemens S7-313 PLC. It's vital to ensure correct communication parameters to the PLC and server, essentially telling both pieces of hardware how they should talk to each other. Typically, this would mean setting up the correct S7 connection, configuring PG/PC interface, and making sure that the right Rack and Slot are selected for your PLC. In your case, using TIA Portal or STEP7 for configuring these parameters should work. Just be sure to check the manual for any specific settings related to your Ethernet CP card, as there might be specifics to follow. Happy programming!

Hi Marwan, indeed, you need to configure the CP card in Siemens Step7 before it can communicate effectively. The CP card acts as a gateway between the PLC and your server, encoding and decoding the PLC language to a format that can be transmitted over Ethernet. You should find the option under the hardware configuration interface in Step7. Remember to ensure you're using the updated drivers for your DP/CP card and assign the same subnet to your PLC and WinXP server. Hope this helps!

Hi Marwan! It sounds like you're off to a great start with your setup, especially since you can ping the PLC successfully. Regarding your question, yes, you will need to configure the CP card to establish effective communication. Make sure to set up the appropriate connections in the Siemens STEP 7 software, including defining the communication parameters such as the IP address and any necessary protocols for the CP. Also, verify that your S7 project in WinCC or InTouch has the correct settings to match the PLC’s configuration. If you run into any issues, checking the diagnostic buffer in the PLC can often provide useful insights. Good luck with your project!

Hi Marwan! It sounds like you're off to a great start since you're able to ping the PLC successfully. Yes, you need to configure the CP card for proper communication with the PLC. Make sure you've set up the correct parameters in the hardware configuration through TIA Portal or STEP 7, including the necessary Ethernet settings and ensuring that the S7 communication is enabled. Double-check the settings in Wonderware as well to ensure they're aligned with the PLC's configuration. Once everything is in sync, you should be able to establish a smooth connection. Good luck with your project!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. How do I establish communication between a Siemens S7-313 PLC and Wonderware InTouch using Ethernet? - To establish communication between a Siemens S7-313 PLC and Wonderware InTouch using Ethernet, you need to ensure the proper configuration of the CP card in the Siemens PLC and set up the communication parameters in Wonderware InTouch.

FAQ: 2. What are the key components needed for Ethernet communication between a Siemens S7-313 PLC and Wonderware InTouch?

Answer: - The key components needed for Ethernet communication between a Siemens S7-313 PLC and Wonderware InTouch include the PLC (S7-313-2D with DPCP Card 343-1EX11-0XE0), a server with the appropriate IP configuration, Archestra software, and Wonderware InTouch Window Maker Version 10.5.

FAQ: 3. Do I need to configure the CP card communication in Siemens for effective communication?

Answer: - Yes, configuring the CP card communication in Siemens is essential for effective communication between the S7-313 PLC and Wonderware InTouch. Make sure to set up the CP card with the correct parameters and establish the necessary connections in the Siemens programming environment.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →