Troubleshooting SSI Encoder Communication Issues with MODBUS and AB PLC5

Question:

Hello! I am currently working with an AB PLC5 that communicates with a Control Techniques Unidrive SP using MODBUS protocol. The Unidrive is connected to an absolute encoder via SSI, but unfortunately, the encoder's cable was damaged, resulting in blown fuses. Thankfully, I had a spare Variable Frequency Drive (VFD), an encoder, and cable available on-site for such emergencies. However, the customer attempted to resolve the issue on their own, but they were unsuccessful. Now, I'm facing challenges in establishing communication and receiving feedback from both the old and new encoders through my laptop. I have experience with this process, so I'm confident in my abilities. According to the customer’s reports, it seems that the "new" cable has an intermittent short circuit between the 24VDC and CLOCK-. Could this issue potentially damage the encoder completely? If anyone has insights or solutions regarding encoder communication, MODBUS, or troubleshooting steps, I would greatly appreciate your input!

Top Replies

How can you connect your laptop to an SSI encoder? Is the connection made via the drive or a designated protocol? Interestingly, I've encountered a different issue—the clock signal was grounded, yet the encoder still functioned. It's important to note that the internal architecture of different encoders can vary significantly. Do you have a new assembly available for testing this connection?

Yes, I received a completely new assembly, but unfortunately, the staff inadvertently damaged the logic driver on the new encoder, which has resulted in a communication failure. Although it was their oversight, it should be noted that the new cable was also defective. Therefore, I needed to request a third encoder, and I had to send them to the racessorry for a delayed response.

Don’t worry—based on my experience, these issues can be quite challenging for technicians to resolve.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: Initial troubleshooting steps should include:

Answer: - Checking all physical connections and ensuring cables are intact and properly connected. - Verifying that the MODBUS settings on the PLC and the Unidrive match and are configured correctly. - Replacing any damaged components such as cables or fuses. - Using diagnostic tools or software to test communication and isolate the problem.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →