Troubleshooting Studio 5000 TON Timers and FOR Loop in Structured Text (ST)

Question:

Hello, I'm fairly new to working with Rockwell PLCs and I'm currently attempting to execute the following code snippet. When Switch 1 is active, the variable bit should increment gradually with a 5-second delay for each step. However, when running the code, the bit increments rapidly by 20 without any delays. Can someone please clarify how Studio 5000 executes programs and provide guidance on restructuring the code to achieve the desired outcome? Thank you.

Top Replies

Visualize the sequence in your mind and observe that the "bit +=1" action occurs consistently in each iteration regardless of the timer's state. Consider relocating this line within the "if delay.DN" condition. Additionally, please note that the loop will not halt during timer operation; instead, it will continuously run 20 times consecutively. To address this, you may want to switch to using a "while" loop instead of a traditional for-next loop. A modified version of the code could be: While bit is less than 20 and delay.DN is true, increment bit by 1 and set xEnable to 0 end while This adjustment ensures smoother execution and coordination with the timer.

Firstly, the bit:=bit+1 code is not included in the delay.DN If-Then structure. Therefore, it will immediately start counting up to 20. Secondly, the For-Next loop is not impacted by the timer completion, causing it to continuously loop from 1 to 20 and update the timer. This process repeats in each scan, incrementing the bit by 1 until it reaches 20 while also setting xEnable to 0. Once the timer reaches completion, it will reset the loop, clear the TimerEnable bit, reset the .DN and .ACC bits, and begin the process anew.

In the discussion thread, joseph_e2 suggests visually looping through the code to understand that the bit +=1 instruction occurs in each loop regardless of the timer status. To ensure the instruction only runs when the delay.DN condition is met, it is recommended to place it within the "if delay.DN" statement. It's important to note that the code will not pause while the timer is running; it will instead run continuously 20 times. Consider using a "while" loop instead of a for-next loop. An alternative approach could be: ``` While bit < 20 If delay.DN then bit += 1 xEnable := 0 End if Wend ``` However, using a while loop may not be ideal if you are waiting for a timer outside the loop to finish. If your goal is to increment "bit" each time delay.DN is true, you can simplify the code by using: ``` If delay.DN AND (bit < 20) then bit += 1 xEnable := 0 End if ```

musterhere inquired about Rockwell PLC programming, seeking guidance on a code implementation issue. The code in question is intended to increment a variable gradually with a 5-second delay between each step when a switch is activated. However, the current code seems to be incrementing the variable immediately without any delays. The user is seeking clarification on how Studio 5000 executes programs and advice on reorganizing the code to achieve the desired outcome. Background: Understanding the scan cycle is essential in PLC programming, as it dictates when events occur. If unfamiliar with the scan cycle, watching a video series can be helpful. General: Given the provided code and the user's novice status, it appears there may be a need for a better understanding of the scan cycle. PLC programming differs significantly from conventional programming, and previous programming experience may be beneficial. Is this task part of a course assignment? Specific: As highlighted by others, the current code does not align with typical PLC operation. The FOR loop incrementing to 20 on every scan cycle, coupled with the 5-second timer expiry, results in unexpected behavior. Additionally, the TONR instruction may not be suitable for this scenario, and using TON could reset the timer as needed. It's important to grasp the scan cycle's implications fully before delving deeper into PLC programming. Familiarity with how the cycle influences program execution, such as the behavior of the .DN bit in the "delay" structure, is crucial for successful programming. Watching educational resources on the scan cycle can aid in uncovering insights and resolving issues in PLC code implementation.

If I understand correctly, you are requesting a number to automatically increase by 1 every 5 seconds until it reaches 20. When the counter hits 20, should it reset to 0 or remain at 20? It seems like a loop may not be necessary for the issue you are tackling. Can you provide more details about the problem you are trying to solve?

Hey there, it sounds like you're experiencing a common issue with timing in Rockwell PLCs. To understand the execution, you've to know that Studio 5000 runs your code in a loop-type sequence called a scan cycle. When it executes the code, it checks all conditions and sets the stages. That might be why you're seeing the variable bit increase so quickly. To achieve the desired 5-second delay, you might want to use a Timer On Delay (TON) instruction. This will start the timer once the rung is true and continue to the next rung after the preset time. Consider restructuring your code to incorporate this. Remember to set the timer preset value to 5000 (as the timer is in milliseconds). Hope this helps!

Hey there, the problem might be a timing mishap in your code. PLCs, including Rockwell, work by cyclically executing what we call a 'Scan Cycle.' In a single scan, the PLC checks the status of inputs, executes the user program line by line based on those inputs, then updates the status of outputs. The complete cycle could happen hundreds or thousands of times per second. It sounds like your code may not be factoring in this rapid scan cycle – causing the bit to increment hastily. You might want to consider implementing a Timer-on delay to put a halt on the cyclic execution for 5 seconds after each increment. Alternatively, you could use a counter to keep track of the number of cycles, initiating an increase on the variable each time a certain count is reached. The value of the count would be proportional to the 5 second delay. Hope this helps, happy coding!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Why is my Studio 5000 program not executing the TON timers and FOR loop as expected?

Answer: Answer: Studio 5000 executes programs in a deterministic manner, meaning it scans through the logic repeatedly at a fixed rate. If the TON timers and FOR loop are not functioning correctly, it could be due to improper logic structure or conflicting instructions.

FAQ: 2. How can I create a 5-second delay for each step in my Rockwell PLC program using Structured Text (ST)?

Answer: Answer: To achieve a 5-second delay between each step, you can utilize TON timers within the FOR loop. By setting the TON timer's preset value to 5 seconds and triggering the increment of the variable bit after the timer has timed out, you can introduce the desired delay.

FAQ: 3. What steps can I take to troubleshoot rapid incrementing of a variable without delays in Studio 5000?

Answer: Answer: To troubleshoot the issue of rapid incrementation without delays in Studio 5000, you should first check the logic of your code to ensure that the TON timers and FOR loop are properly structured. Additionally, verify that the switch activation condition and variable incrementation are correctly synchronized within the program.