Troubleshooting tag reading issues in Studio Logix 5000 with Wonderware FSGateway and RSLinx OPC

Question:

Hello, I am attempting to replicate a testing scenario in Studio Logix 5000 with Wonderware FSGateway, but I am facing issues with my tags not reading. Despite everything appearing correct in diagnostics, the problem persists. Previously, I was able to successfully use this setup during the RSLinx Classic trial period. However, after purchasing a license and changing the computer name, I encountered difficulties. This information could be vital for troubleshooting purposes. The occurrence of these issues post license activation and computer name change is perplexing to me.

Top Replies

Are you looking for information on how to access a window tag? Your access will only be active once the tag is placed correctly on the window or in a window viewer script. The quality code 00C0 signifies good performance.

I suspect the issues might be related to the computer name change considering everything worked fine during the RSLinx Classic trial period. Have you tried reverting back to the original computer name to eliminate that as the root cause? Alternatively, did you update the computer name in the FSGateway configuration after the change was made? If there's a discrepancy between the registered computer name and the one configured in FSGateway, you might face tag reading errors. Finally, ensure all your licenses are correctly activated and assigned to the correct equipments - that could be another potential culprit.

Hi! It's interesting that you didn't encounter any issues during the RSLinx Classic trial period, but now facing difficulties after activation and changing the computer name. Have you considered that the computer name change could be your issue? When you change the computer name, the path to your tags can change which may result in analogous problems. I recommend trying to revert back to the original computer name before the change happened and see if this resolves the TAGs reading issue. Additionally, make sure to review your FSGateway setup and ensure that HMI server's topic configured in Wonderware is accurate. Keep us updated!

It sounds like you're having a real headache with Studio Logix 5000 and FSGateway. If your setup was working fine during the RSLinx Classic trial and issues only arose after purchasing a license and changing the computer name, the problem might be interacting with the new license or computer name change. I'd recommend rechecking your license activation to ensure it's correct. Also, you might want to verify whether the computer name change is properly recognized by the software. It might be a case that the software is still identifying your computer with the old name which is causing the tags not to read.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Why are my tags not reading in Studio Logix 5000 with Wonderware FSGateway despite correct diagnostics?

Answer: Answer: There could be various reasons for this issue, such as configuration errors, connectivity problems, or system changes affecting the setup.

FAQ: 2. How can I troubleshoot tag reading issues in Studio Logix 5000 with Wonderware FSGateway?

Answer: Answer: You can start by checking the configuration settings, ensuring proper connectivity between devices, and reviewing any recent system changes that may have impacted the setup.

FAQ: 3. Why did I encounter tag reading issues after purchasing a license and changing the computer name?

Answer: Answer: Changes in system parameters, such as computer name or licensing, can sometimes lead to configuration conflicts that affect tag reading functionality. It's essential to verify and update settings accordingly after such modifications.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →