Troubleshooting TIA Portal V15 Installation Issue on Windows 10

Question:

Greetings! I am currently attempting to set up the TIA Portal v15 on a Windows 10 computer. Upon completing the installation process, I am prompted to restart the PC, only to have the installation software restart once more. I have repeated this process multiple times with no success. Any guidance on this matter would be greatly appreciated. Thank you.

Top Replies

Encountering an installation issue on Windows 10? A recent thread on the Siemens support forum discusses a potential problem with existing SQL server installations causing compatibility issues. Check out the discussion here: https://support.industry.siemens.co...nstallation-problem/188998?page=0&pageSize=10.

If TIA does not install properly, one recommended solution is to completely uninstall TIA from the PC, including all Siemens references in the registry. I encountered a similar problem and had to manually remove all traces of TIA after several attempts before successfully installing it on Windows 7. It is advisable to thoroughly remove any leftover files even if the uninstallation program indicates that it has been removed, as it may still leave remnants behind.

Hello, I have tried following the instructions in the link you mentioned to resolve an issue with my PC. I accessed the registry editor at "HKEY_LOCAL_MACHINE\System\CurrentControlSet\Control\Session Manager" and deleted the "PendingFileRenameOperations" entry. However, the problem persists even after rebooting as the installer continues from where it left off. This workaround had successfully resolved a similar issue on a different PC about a year ago, but unfortunately, it has not worked on this particular PC.

In my earlier post, I recommended removing all Siemens references from the registry. Despite trying to remove specific items as advised, I struggled to resolve the issue until I spent hours meticulously deleting any mention of Siemens from the hard drive. It's essential to consider removing all possible references, as similar issues have been reported with SQL. Consider a thorough cleanup before reinstalling necessary components.

I encountered a similar problem not long ago when trying to install a program from an external drive. However, once I transferred the installation files to my computer's hard drive, it worked without any issues. I suggest giving this method a try if you're experiencing the same issue.

It sounds like you're stuck in some sort of installation loop. Sometimes, this can occur with the TIA Portal due to interference from an antivirus program or another application running in the background. Try disabling your antivirus temporarily, and close down any unnecessary applications before installing. Just make sure to turn your antivirus back on once you've completed the installation! If that still doesn't help, double-check that your system meets the required specifications for TIA Portal v15, you might be missing a critical update or driver that’s necessary for the installation. Hope this helps!

It sounds like you're stuck in a bit of an installation loop. It might be worth trying a clean install; uninstall the TIA Portal v15, restart your PC, disable any antivirus software temporarily, and try reinstalling the software. Make sure you are running the installer as an administrator. Also, ensure your system meets the software's minimum requirements. Sometimes, compatibility issues can cause these endless loop situations.

It sounds frustrating to deal with that loop! One thing you could try is running the installer as an administrator, which often helps with permissions-related issues. Also, make sure your Windows is fully updated and that there are no pending restarts required by other applications before you attempt the TIA Portal installation again. If that doesn’t work, checking for software conflicts or freeing up disk space might also help. Good luck!

Hey there! It sounds like you're dealing with quite a frustrating installation loop. Have you tried running the installer as an administrator? Sometimes that helps with permission issues. Also, make sure to disable any antivirus software temporarily while you're installing, as it can occasionally interfere. If the problem persists, checking the Event Viewer for any error logs could give you some clues about what's going wrong. Good luck, and I hope you get it sorted out soon!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What could be causing the TIA Portal v15 installation issue on Windows 10 where the software restarts after the PC restart?

Answer: Answer: This issue could be related to a variety of factors, such as compatibility issues, system settings, or installation errors.

FAQ: 2. How can I troubleshoot the TIA Portal v15 installation problem where the software keeps restarting after the PC restart?

Answer: Answer: You can try solutions like checking system requirements, running the installation as an administrator, disabling antivirus software, or reinstalling the software.

FAQ: 3. Are there specific steps recommended to resolve the TIA Portal v15 installation issue on Windows 10?

Answer: Answer: Some recommended steps include ensuring your system meets the minimum requirements, checking for conflicting software, and verifying the installation media for any errors.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  â†’