Troubleshooting WindowMaker Access Issue with InTouch 10.1 License

Question:

Hello, I am currently using InTouch 10.1 and attempting to access WindowMaker to make some adjustments. I am utilizing a dongle for the license. While I can access the window viewer, I am encountering issues with accessing WindowMaker.

Top Replies

In order to utilize windowmaker, you must have a development license, as a runtime license is insufficient.

Make sure your dongle is properly recognized by your system; sometimes it can be a simple connection issue. You might also want to check if your user account has the necessary permissions to access WindowMaker. If the problem persists, consider checking for any updates or patches for InTouch 10.1 that could resolve compatibility issues. Finally, a quick restart of your PC might help clear up any lingering problems. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Why am I facing issues accessing WindowMaker in InTouch 10.1 despite having a valid dongle license? - The issue could be related to the configuration settings or compatibility issues. It is recommended to double-check the license activation and ensure that the dongle is properly connected to the system.

FAQ: 2. How can I troubleshoot the access issue with WindowMaker in InTouch 10.1?

Answer: - You can start by verifying the dongle connection, checking for any software updates or patches for compatibility, and reviewing the user permissions for accessing WindowMaker.

FAQ: 3. Are there any common troubleshooting steps for resolving WindowMaker access issues in InTouch 10.1?

Answer: - Some common steps include restarting the application, checking the license server status, ensuring the dongle driver is up to date, and verifying network connectivity for license validation.

FAQ: 4. What are the possible reasons for being able to access the window viewer but facing difficulties with WindowMaker in InTouch 10.1?

Answer: - The issue may stem from specific permissions required for WindowMaker access, separate from the window viewer. It is advisable to review the user roles and permissions settings within the application.

FAQ: 5. Is there a support channel or documentation available for resolving WindowMaker access problems in InTouch 10.1?

Answer: - Yes, you can refer to the product documentation, online forums, or contact technical support for assistance in troubleshooting and resolving WindowMaker access issues in InTouch 10.1.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →