Understanding Latency in Time Stamping for LV Motor Feeder Signals: Gateway vs. Protection Relay Timestamps

Question:

I am searching for information about latency in time stamping for signals from LV motor feeder to DCS, specifically focusing on the difference between time stamping added by a gateway converting Modbus TCP to IEC 61850 and the native timestamping from the protection relay. This comparison is crucial for optimizing communication efficiency and ensuring accurate data transmission.

Top Replies

Latency issues can arise depending on the gateway being used and the poll rate set, resulting in delays of several seconds. Unfortunately, with Modbus TCP, there are no known options for timestamping data at the motor feeder. One workaround is to continuously poll data from the LV motor feeder at the maximum rate supported by the gateway (usually around 0.1 seconds) and enable change of state (COS) for gateway signals to the DCS. This way, when the IEC 61850 section timestamps a change, the DCS can display the most up-to-date timestamp possible. However, be aware that this method will increase network traffic between the gateway and the LV motor feeder. Alternatively, consider upgrading the interface for your LV motor feeder to DNP over Ethernet. This could enable your DCS to display timestamps from DNP, potentially resolving the timestamping issue.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What is the purpose of time stamping in LV motor feeder signals communication?

Answer: - Time stamping is essential for accurate data transmission and synchronization between different devices in the network.

FAQ: 2. What is the difference between time stamping added by a gateway converting Modbus TCP to IEC 61850 and native timestamping from the protection relay?

Answer: - The gateway adds a timestamp during the protocol conversion process, while the protection relay provides a native timestamp directly from the device.

FAQ: 3. How does latency impact communication efficiency in time stamping for LV motor feeder signals?

Answer: - Latency can affect the accuracy of data transmission and synchronization between devices, highlighting the importance of minimizing delays for efficient communication.

FAQ: 4. Why is it crucial to optimize latency in time stamping for LV motor feeder signals?

Answer: - Optimizing latency ensures real-time data transmission, improves system reliability, and enhances the overall performance of the communication network.

FAQ: 5. What factors should be considered when choosing between gateway and protection relay timestamps for LV motor feeder signals?

Answer: - Factors such as accuracy, synchronization requirements, communication protocol compatibility, and network efficiency should be evaluated when deciding between gateway and protection relay timestamps.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →