Uploading from Mitsubishi Q series PLC with motion control: How to do it with GX Works 2 and MR Configuration 2.

Question:

Hello everyone, I am using a machine equipped with a Mitsubishi Q03UDVCPU PLC, Q172DSCPU motion control module, and MR J3 servo drives. I have successfully uploaded the Q03UDVCPU PLC using GX Works 2 and configured the servo drives with MR Configuration 2. Now, I am wondering if it is possible to upload from the Q172DSCPU motion control module as well. Do I need to use MT Developer 2 for this task? If so, should I upload from the PLC or the motion control module? Thank you.

Top Replies

Although I am not too familiar with that particular CPU, I believe that uploading using MT is necessary. The configuration of the system will determine the methods available for controlling the drives, such as utilizing an SFC program in the QD CPU or passing information via the standard CPU. To set up, you will need to upload the configuration and if a new QD module is installed, you also need to download the OS using MT. These tasks can be completed by connecting to either the Q CPU or the QD CPU. If connecting via the Q CPU, simply select the CPU number, which is likely CPU01 (though this may not be accurate, as the other CPU would presumably be CPU00).

To successfully program MT Developer, you will require two different applications - one for PLC and one for Motion CPU. The PLC application requires either GxWorks2 or GX Developer for uploading purposes. Meanwhile, the Q172DSCPU application specifically requires MT Developer for proper functioning. Additionally, MR Configurator is essential for configuring servos.

Yes, you're on the right track. You should use the MT Developer 2 software in order to upload the data from your Q172DSCPU motion control module. Typically, you don't need to upload from the PLC as long as the module in question is correctly installed in the system rack. The PLC and the modules are separate entities, but they interact within the system. Therefore, focus on getting the motion control module to work correctly. It's usually safer and simpler that way than tinkering with both the PLC and the motion control module concurrently.

Hi there! Yes, it's absolutely possible to upload from the Q172DSCPU motion control module and you're spot on with needing to use MT Developer 2. However, you'll be uploading from the motion control module, not the PLC. This is because the motion control module is where all the servo-specific routines and parameters are stored. MT Developer 2 will facilitate the process as it was specifically designed to manage Mitsubishi's servo systems. Just make sure you have the proper configuration set up and it should work splendidly.

Yes, you're on the right track! You should indeed use MT Developer 2 to upload from the Q172DSCPU motion control module. Remember, it's crucial to upload from the motion control module specifically, not from the PLC. That's because the PLC and motion control module store their data independently, and you want to access those specific motion control parameters and settings. Your previous configuration of the PLC and servo drives shouldn't affect this process. Good luck!

You're correct in assuming that you need MT Developer2 for this task. You should upload directly from the Q172DSCPU motion control module rather than the PLC. While GV Works2 is great for PLC programming, for motion control upload and configuration, MT Developer2 is designed for the purpose and permits a more granular control and diagnosis when it comes to motion tasks. Hope this helps!

Yes, you'll definitely need to use MT Developer 2 to upload from the Q172DSCPU motion control module since it's specifically designed for that purpose. As for whether to upload from the PLC or the motion control module, I recommend starting with the motion control module first, as it will ensure that you have the latest motion parameters before syncing everything back to the PLC. Good luck, and feel free to share your experiences—they can be really helpful for others!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Can I upload from the Mitsubishi Q172DSCPU motion control module using GX Works 2? - Unfortunately, GX Works 2 does not support uploading from the motion control modules directly. You will need to use MT Developer 2 for this task.

FAQ: 2. Should I upload from the PLC or the motion control module when using MT Developer 2?

Answer: - When using MT Developer 2, you should upload from the motion control module (Q172DSCPU) to access its specific programming and configuration settings.

FAQ: 3. Is MR Configuration 2 compatible with MR J3 servo drives for configuration?

Answer: - Yes, MR Configuration 2 is the appropriate software tool for configuring MR J3 servo drives in conjunction with Mitsubishi Q series PLCs and motion control modules.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →