Utilizing C-More HMI to Dynamically Display Tag Descriptions from CompactLogix

Question:

I am currently experimenting with integrating the .@Description feature to retrieve description strings from a CompactLogix system and display them dynamically on a C-More HMI. Is this functionality exclusive to PanelView or can it be utilized across multiple platforms?

Top Replies

It is important to note that extended properties can only be accessed through a symbolic tag read, rather than a logical read as stated in the manual. Since these values typically remain constant, it may not be necessary to optimize their reading. However, it is advisable to investigate how your device performs CIP tag reads for accuracy. If I am mistaken, I apologize for any confusion.

While it's true that the .@Description feature is often associated with PanelView systems, its use is not exclusive to this platform. In fact, it should be compatible with most HMI platforms that can communicate with your CompactLogix system, including the C-More HMI. However, it's always good to double-check the specifications to ensure compatibility as communication protocols may vary. Remember that pulling descriptions directly into your HMI can optimize your processes as it eliminates the need to manually enter each tag description.

From my experience, the .@Description feature isn't exclusive to PanelView. While it does work excellently on PanelView, it should be applicable to other platforms, as long as those platforms can communicate with CompactLogix using the right protocols. However, the processes might require additional programming depending on the specific HMI. I've not personally used it with C-More HMI, so you might want to consult the documentation or reach out to their tech support for detailed assistance.

From my understanding and experience, the .@Description feature is not exclusive to PanelView. It's part of the OPC standard, thus it should theoretically work with any HMI system that fully supports OPC - including C-More. However, the specific integration may vary and you might need to adjust your configuration or script accordingly. Make sure to thoroughly test it out to ensure everything is working as expected.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Can the .@Description feature be used to dynamically display tag descriptions from a CompactLogix system on a C-More HMI? - Yes, the .@Description feature can be utilized to retrieve description strings from a CompactLogix system and display them dynamically on a C-More HMI.

FAQ: 2. Is the functionality of displaying tag descriptions dynamically limited to PanelView systems?

Answer: - No, this functionality is not exclusive to PanelView systems and can be implemented across multiple platforms, including C-More HMIs.

FAQ: 3. How can I set up the integration of tag descriptions from a CompactLogix system to be displayed dynamically on a C-More HMI using the .@Description feature?

Answer: - You can achieve this by configuring the .@Description feature to access tag descriptions from the CompactLogix system and then dynamically displaying them on the C-More HMI interface.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →