Where to Find Logic Master 90 Software for GE Fanuc 90-30 PLC Systems

Question:

Can anyone assist me in locating a copy of Logic Master 90 Software? I require it for a conversion project. I have a printout of the PLC contents, but I doubt its accuracy. I would like to upload the controller for comparison. I already have the necessary com cable.

Top Replies

If you need assistance communicating with a Programmable Logic Controller (PLC), please message me your email address to receive a .zip file. To interface with the PLC, it is recommended to use Logicmaster on a 32-bit operating system. I personally utilize DOSBox on a 32-bit XP system. Additionally, I have experienced issues with USB/serial converters losing connection during uploads, so a computer with a physical COM port is preferable for a stable connection.

If you're looking to communicate with a PLC and need to run Logicmaster on a 32-bit operating system, it's best to use a computer with a real COM port. I recommend using DOSBox on a 32-bit XP for optimal performance. USB/serial converters can sometimes have trouble maintaining a connection long enough to complete uploads. If you need LM 90, feel free to send me a PM with your email address and I'll send you a .zip file. Thank you in advance!

Please send me a private message (PM) containing your email address to discuss the concerns related to using a 32-bit operating system (OS) and any potential issues that may arise with USB/serial converters.

Hey Steve, I'm currently connecting with a DB9 to DB15 cable on a 32-bit operating system. Thanks!

Upon checking your email, you should find a notification confirming your addition to the shared list for LM90 on my Google Drive. Hopefully, the DB9 to DB15 cable you received comes equipped with an RS485/RS232 converter, as the PLC power supply's fifteen-pin port specifically requires RS485 connectivity. It is important to note that the converter operates on a 5VDC power supply connected to pin 5.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Where can I find Logic Master 90 Software for GE Fanuc 90-30 PLC Systems?

Answer: The Logic Master 90 Software for GE Fanuc 90-30 PLC Systems can typically be obtained from authorized GE Fanuc distributors, online industrial automation software retailers, or through specialized industrial software vendors.

FAQ: 2. How can I verify the accuracy of the PLC contents before uploading the controller for comparison?

Answer: To verify the accuracy of the PLC contents, you can consider using simulation tools or virtual environments to run the program and compare the expected outcomes with the actual results. Additionally, you may consult the PLC documentation or contact technical support for assistance.

FAQ: 3. What is the importance of having the necessary com cable for uploading the controller?

Answer: The com cable is essential for establishing a communication link between the PLC and the computer running the Logic Master 90 Software. This cable enables data transfer, programming, and monitoring of the PLC system, allowing for efficient troubleshooting and maintenance tasks.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →