Where to Find RSlogix 5 Installer as a TechConnect Member

Question:

Hey there! Does anyone happen to have a copy of the RSlogix 5 installer? I am a TechConnect member, do you think they would be able to provide me with a download link? Unfortunately, I seem to have misplaced the RSLogix 5 serial number from my list of support resources.

Top Replies

Thank you, Myles Petro, for your support!

I'm pleased you found what you were looking for. Just so you know, I can still access RSLogix 5 with a legitimate serial number for download.

It seems like the issue is that the serial number was removed from support, preventing him from downloading it. However, it is assumed that he still has a legitimate license. He just requires the installer in order to reinstall his existing ownership.

We made a similar decision with Legacy TechConnect due to its high cost. After removing it from our TechConnect, we noticed that updates were no longer available. While I can no longer access the latest version, I can still download the previous supported version. Regrettably, I am unable to transfer the license to our license server due to its age, so we have designated a specific laptop for PLC5 support. However, that's a separate issue altogether.

The price for an Allen Bradley PLC 5 License has skyrocketed, now reaching around $12,000. This license used to be part of the Legacy toolkit that included SLC but has since been separated. In conversion projects requiring access to PLC 5 code, options include obtaining a temporary license from the distributor or having the customer provide a PDF. This steep cost for the PLC 5 License has become a significant expense for many in the industry.

Hey! It's always a bummer when you misplace something important like that. Since you're a TechConnect member, reaching out to Rockwell's support directly might be your best bet; they can usually help with access to software and might be able to assist in retrieving your serial number as well. Good luck!

Hey! If you’re a TechConnect member, you should definitely reach out to Rockwell Automation support directly; they can often help with the installer and might be able to look up your serial number through your account details. It’s a good idea to have your customer ID handy when you contact them to speed up the process!

Hey! If you're a TechConnect member, they should definitely be able to help you out with the RSLogix 5 installer and possibly even assist you in retrieving your serial number. I’d recommend reaching out to their support directly—sometimes they can even look up your serial number for you if you provide them with some account info. Good luck, and I hope you get up and running soon!

Hey! I don’t have the installer myself, but as a TechConnect member, you should definitely reach out to Rockwell Automation support directly. They’re usually pretty helpful with such requests, and they can verify your membership to provide you with the necessary files. Sorry to hear about the serial number mix-up—keep an eye out for it in your email archives too; sometimes, the order confirmation emails might have it!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Question: I am a TechConnect member and need the RSlogix 5 installer. Can TechConnect provide me with a download link?

Answer: Answer: Yes, as a TechConnect member, you should be able to request and download the RSlogix 5 installer from their support resources.

FAQ: 2. Question: What should I do if I have misplaced the RSLogix 5 serial number from my support resources list?

Answer: Answer: If you have misplaced the serial number, you may need to contact TechConnect support to retrieve or reset the serial number for your RSLogix 5 software.

FAQ: 3. Question: Is it possible to obtain the RSlogix 5 installer without the serial number as a TechConnect member?

Answer: Answer: It is recommended to have the serial number for authentication purposes. If you have lost it, TechConnect support should be able to assist you in recovering the serial number to download the RSlogix 5 installer.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →