Which TIA Portal Version is Compatible with Siemens CPU 1510SP F-1 PN?

Question:

I am facing difficulties uploading from a Siemens CPU 1510SP F-1 PN. Upon opening TIA Portal 17, I noticed that the CPU indicated TIA Portal 14 SP1 and firmware 2.6.0. Despite switching to TIA Portal 14 SP1, I encountered errors due to software incompatibility with the hardware. The CPU model was not available in the hardware catalog, making it impossible to add to the project. After some research, I discovered that Siemens states this CPU and firmware combination is only compatible with TIA Portal 15.1, not V14 SP1. Should I acquire TIA Portal 15.1 to resolve this issue? Could there be a discrepancy in the TIA Portal or firmware version reported by the CPU?

Top Replies

For enhanced functionality, consider installing the TIA14 SP1 upd10 update and HSP support packages on your TIA14 software. This will ensure compatibility and optimize performance.

Are you equipped with the STEP 7 Safety Advanced license within your Automation Manager tool? Without this essential license, the failsafe CPU options will not be visible in the product tree.

Lare suggested installing TIA14 SP1 upd10 and HSP support packages in TIA14. I have upd10 but need to check for the support packages. Thanks for the tip. Puddle inquired about the STEP 7 Safety Advanced license in Automation Manager. Without this license, failsafe CPU options will not be visible in the product tree. I do not have that license. Is it included in version 15.1 or do I need to obtain it separately? This information should have been clearly stated on the firmware page by Siemens.

Strantor inquired about the inclusion of a specific component, questioning if it was part of version 15.1. Additionally, they expressed the need to understand if obtaining version 15.1 would still require obtaining the aforementioned component. This aspect appears to have been overlooked by Siemens when updating the firmware page. Safety Advanced from Siemens essentially authorizes the use of safety PLCs, serving as an additional license. Historically, it was distributed on a separate installation disk. To utilize safety PLCs, this license must be installed across all versions of Portal. It is imperative to have the license for the latest version available. In cases where version 15.1 is required, it is advisable to first attempt version 14 SP1. Firmware updates typically support older versions, allowing for compatibility with projects created on newer versions. The PLC likely came pre-installed with the latest firmware version.

Typically, the safety program in a PLC is not configured for uploading. Unless the programmer has enabled this option, you won't be able to retrieve data from the PLC.

From what you've described, it sounds like updating to TIA Portal 15.1 could potentially resolve your issue. Hardware and software compatibility can be tricky and often requires precise version matching, as is the case with your Siemens CPU. Siemens' recommendation to use TIA Portal 15.1 should not be overlooked. There could be a discrepancy in the reported TIA Portal or firmware version, but it's also likely that your current setup is simply incompatible. Also, remember to save a backup of your project before making any major updates, just to be on the safe side.

Absolutely, upgrading to TIA Portal 15.1 might just resolve the compatibility issue you're facing. Each version of TIA Portal is often attuned to specific CPU models and firmware, when Siemens launched your CPU 1510SP F-1 PN model, it was likely designed alongside the TIA Portal 15.1 for symbiotic compatibility. Misalignments in versioning can lead to the kind of issues you're experiencing. It’s worth a shot to try using the TIA Portal 15.1, while ensuring your firmware stays updated. Technology often requires the right pairings to function seamlessly. Please bear in mind to back up all necessary data before initiating any updates or changes. It may also be helpful to reach out to Siemens support for any potential technical insights.

Based on your research and the error messages you're encountering, it certainly seems that TIA Portal 15.1 is the way forward to resolve the incompatibility issues with your current CPU and firmware combination. Although, I would first suggest contacting Siemens support to potentially rule out any discrepancies or bugs in the system reporting incorrect information about TIA portal or firmware versions. However, seeing that their official compatibility document says so, it's less likely to be an issue from their end. Upgrading to TIA Portal 15.1 seems to be a justified expense for smoother operations.

Based on your research and the symptoms you're experiencing, it certainly seems like transitioning to TIA Portal 15.1 would potentially solve your issue. Given that Siemens themselves suggest compatibility with that version, it's worth a shot. As for the potential discrepancy in the TIA Portal or firmware version reported by the CPU, it's possible, but seems less likely. Hardware-software compatibility issues can often be the root cause of such glitches, and sorting them out may well resolve your problem. However, as always, keep a keen eye on the details to avoid missing any other potential issues.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What TIA Portal version is compatible with Siemens CPU 1510SP F-1 PN?

Answer: - Siemens CPU 1510SP F-1 PN is compatible with TIA Portal 15.1 according to Siemens documentation.

FAQ: 2. Why am I facing difficulties uploading from a Siemens CPU 1510SP F-1 PN in TIA Portal?

Answer: - If you are encountering errors or software incompatibility issues, it may be due to using a TIA Portal version that is not compatible with the CPU and firmware combination.

FAQ: 3. Is TIA Portal 14 SP1 compatible with Siemens CPU 1510SP F-1 PN?

Answer: - No, TIA Portal 14 SP1 is not compatible with Siemens CPU 1510SP F-1 PN. It is recommended to use TIA Portal 15.1 for compatibility.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →