Why is the DC Bus Value Not Displaying in Kinetix 5500 with 5069-L310ERM Controller?

Question:

Hello, I am currently using a Kinetix 5500 with a 5069-L310ERM controller. I have noticed that the DC Bus value is not appearing in the controller tags. However, on the Kinetix screen, the DC Bus value is showing as approximately 660V. Any insights on why the controller tags are not displaying this information would be appreciated. Thank you.

Top Replies

No need to worry, I have figured it out.

It sounds like the lack of DC Bus value in the controller tags might be caused by a communication issue between the Kinetix 5500 and your 5069-L310ERM controller. It could also be a setup fault in your controller. I'd recommend checking the connections between your devices first. If that doesn't resolve the issue, look into the programming of your controller. Make sure the parameters related to DC Bus value are correctly configured and not blocked from access by security settings.

It seems like there could be a communication or firmware compatibility issue between your Kinetix 5500 and the 5069-L310ERM controller. Try to update the firmware and make sure all your communication settings are correct. If that doesn't resolve the issue, you might need to contact Rockwell support, as it could be a specific issue with your configuration. The DC Bus tag could be hidden or masked in some way in the controller programming, so double-check your tag settings.

Hey there, it sounds like you might be encountering an issue with firmware compatibility or a potential configuration issue. First, I would suggest doing a firmware check to ensure that your controller and Kinetix drive are using compatible versions. If that's not the issue, you might want to consider checking the Ethernet configuration. The 5069-L310ERM controller often requires specific Ethernet configurations for some information to show up correctly in the controller tags. Hope this helps!

Hey! It sounds like you're dealing with some communication or configuration issues between your Kinetix 5500 and the 5069-L310ERM controller. First, double-check that the DC Bus is properly configured in your controller settings; sometimes parameters need to be explicitly defined to show up in tags. Also, ensure that your firmware versions are compatible and up to date, as mismatches can lead to incomplete tag data. If all else fails, it might be worth consulting the manufacturer's documentation or reaching out to their support for more tailored guidance. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Why is the DC Bus value not displaying in the controller tags for Kinetix 5500 with a 5069-L310ERM controller? - The DC Bus value may not be displaying in the controller tags due to configuration settings or communication issues between the controller and the Kinetix system.

FAQ: 2. How can I troubleshoot the issue of the DC Bus value not showing in the controller tags?

Answer: - You can start by checking the configuration settings related to the DC Bus monitoring in the controller software. Ensure that the tags are properly configured and mapped to display the DC Bus value.

FAQ: 3. Is there a specific setting or parameter that needs to be adjusted to enable the display of the DC Bus value in the controller tags?

Answer: - Yes, you may need to review the parameters related to DC Bus monitoring and ensure that the appropriate settings are selected to enable the controller to read and display the DC Bus value accurately.

FAQ: 4. What could be the reason for the DC Bus value showing on the Kinetix screen but not in the controller tags?

Answer: - The discrepancy between the DC Bus value displaying on the Kinetix screen and not in the controller tags could be due to data transmission issues, configuration mismatches, or a potential software glitch that needs to be addressed.

FAQ: 5. Are there any troubleshooting steps recommended to resolve the discrepancy in displaying the DC Bus value between the Kinetix screen and the controller tags?

Answer: - Yes, you can try reconfiguring the tags, checking the communication

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →